For insurers & adjusters

Scope and estimate validation

Every handler knows the feeling: a contractor’s estimate lands and the number looks wrong — too high, too low, or built on a scope that doesn’t match the photographs. Challenging it without technical backup is a negotiation; challenging it with evidence is a decision.

Validated / 16 linesEvidence-led scope£38,215
Every variance has somewhere to point: a photograph, a measurement or a rate.
Evidence ledgerCredentials / method / fee position
  1. 01
    MCIOBChartered Construction Manager
  2. 02
    AssocRICSAssociate Member, RICS
  3. 03
    Fixed feesAgreed before work starts
  4. 04
    Evidence-ledReports built to be relied on
  5. 05
    Two clear lanesProfessional / policyholder
  6. 06
    A decade in claimsSurveying and complex losses

Scope validation is that evidence. The submitted scope and estimate are reviewed against the actual damage — from the file, or with a site inspection where the papers don’t settle it — line by line: items that don’t belong, items that are missing, quantities that don’t survive measurement, rates outside market range.

The output is a validation report your file can rely on: each variance identified, evidenced and priced, with a defensible adjusted figure. Prepared under a Chartered Construction Manager who has priced, delivered and audited reinstatement works — the review reads the estimate the way the contractor wrote it.

Use case

When validation earns its fee

  1. 01

    Estimates that look wrong but need evidence to adjust

  2. 02

    Scopes with betterment, duplication or peril-creep concerns

  3. 03

    High-value or contested losses where the figure will be challenged

  4. 04

    Desktop reviews at volume — validation works from papers nationally

The output

What the review covers

  • 01

    Line-by-line reconciliation of scope against evidenced damage

  • 02

    Quantity checks against measurement, not assertion

  • 03

    Rate benchmarking against recognised schedules and market ranges

  • 04

    Betterment, duplication and out-of-peril items identified and priced

  • 05

    Missing items flagged too — validation cuts both ways, which is what makes it credible

  • 06

    A written validation report with an adjusted, defensible figure

From brief to answer

How it works

  1. 01

    Send the file

    Scope, estimate, photographs, and the policy peril. Desktop reviews are quoted on the papers.

  2. 02

    Review

    Line-by-line reconciliation, with a site inspection added where the papers leave genuine doubt.

  3. 03

    Report

    Variances evidenced and priced, adjusted figure stated, ready for your negotiation with the contractor.

Questions, answered

What people ask before instructing

Desktop or site-based?

Desktop first — most estimates can be validated from a well-photographed file, and it is faster and cheaper. Site inspection is recommended honestly where the papers cannot settle a material line, and attendance runs within our travel radius.

Will the review always cut the figure?

No — and you would not want a reviewer who guaranteed that. Where the estimate is right, the report says so; where items are missing, they are added. What you get is a figure that survives challenge, in either direction.

Can this run at volume?

Yes — desktop validation on instructed terms scales, with consistent format and turnaround agreed at onboarding.

Need scope validation?

Tell us where the claim stands and you'll get a fixed fee — plus a straight answer on whether this service genuinely helps your position.